Vancorneft ÎÀÎ NK «ROSNEFT»
This plant is used as the main source of the electrical power supply of the oil recovery installations.
Installed power plant capacity is 200 ÌW.

Auxiliary Power Plant at Vankor Oil-Field, Vankorneft CJSC. General View

Close view of 110 kW indoor distribution unit, storehouses for spares, materials and oils

May 2008. Installation of metallic structure of 110 kW indoor switch gear.

July 2008. Installation of foundation grills for transformers and cable rack with a crossover.

July 2008. Closing of thermal circuit of 110 kW indoor switch gear.

August 2008. Installation of overhead crane with a lifting capacity of 20 tons in the
boiler-and-turbine section.

October 2008. Preparation for the installation of the transformers.

October 2008. Installation of the transformers.

October 2008. Construction site of captive power plant gas turbine of Vankor oil-field.

October 2008. Arrival of main equipment to be handed over to installation.

October 2008. Installation of exhaust pipes.

October 2008. Completion of exhaust pipes’ installation procedure.

October 2008. Fuel gas processing unit and starting boiler house.

October 2008. Starting boiler-house.

December 2009. The first phase

December 2009

December 2009