Vancorneft NK ROSNEFT


This plant is used as the main source of the electrical power supply of the oil recovery installations.
Installed power plant capacity is 200 W.

 

Auxiliary Power Plant at Vankor Oil-Field, Vankorneft CJSC. General View

 

14.jpg

Close view of 110 kW indoor distribution unit, storehouses for spares, materials and oils

 

14.jpg

May 2008. Installation of metallic structure of 110 kW indoor switch gear.

 

14.jpg

July 2008. Installation of foundation grills for transformers and cable rack with a crossover.

 

14.jpg

July 2008. Closing of thermal circuit of 110 kW indoor switch gear.

 

14.jpg

August 2008. Installation of overhead crane with a lifting capacity of 20 tons in the
boiler-and-turbine section.

 

14.jpg

October 2008. Preparation for the installation of the transformers.

 

14.jpg

October 2008. Installation of the transformers.

 

14.jpg

October 2008. Construction site of captive power plant gas turbine of Vankor oil-field.

 

14.jpg

October 2008. Arrival of main equipment to be handed over to installation.

 

14.jpg

October 2008. Installation of exhaust pipes.

 

14.jpg

October 2008. Completion of exhaust pipes’ installation procedure.

 

14.jpg

October 2008. Fuel gas processing unit and starting boiler house.

 

14.jpg

October 2008. Starting boiler-house.

 

December 2009. The first phase

 

December 2009

December 2009


 