FGU «Kalmmeliovodhoz», an institution of the Department of Agriculture
Construction of off-site power supply installations of Iki-Burulsky group water supply system that delivers to Republic of Kalmykia ground waters of Severo-Levokumsky deposits and that is situated in Stavropol Territory, total length is 53 km:
- «Vodozabor» substation; - 110/6êÂ;
- «Vodozabor -Neftekumskaya» high voltage line - 110ê ;
- «Vodozabor -Kolodeznaya» high voltage line - 110êÂ.

December 2008. 110 kW Open Distribution Unit Construction

December 2008. 110 kW HV Line Cross Section Alignment

December 2008. Installation of supports in the span of crossing with existing 110 kW HV Line

April 2009. Transformer Installation is finished

April 2009. Installation of line isolators and high-frequency chokes is over

April 2009. Installation of 110 kW Open Distribution Unit and cabling are over