The list of commissioned facilities or the ones under construction



Power installations in progress

  Customer Object Capacity works Period  
Novomoskovskaya SDPP GK-4 Combined-cycle plant with two gas-turbine power plant 240 W construction 2008-2010
Vancorneft NK ROSNEFT This plant is used as the main source of the electrical power supply of the oil recovery installations. Installed power plant capacity is 200 W. &... More 200 W construction 2006-2010
Astahanskaya SDPP YGK GK-8 State-of-the-art Steam Gas Unit with a total capacity of 110-125 MW.   General View of Astrakhanskaya SDPP Design.   General View of... More 115 MW construction 2007-2010
Voronezhskaya TPP-2 GK-4 Development and renovation CHP, with the application of the best practicable control technology, meeting all technical and ecological requirements. ... More 115 W construction 2007-2010


Finished power installations

  Customer Object Capacity works Period  
FGU Kalmmeliovodhoz, an institution of the Department of Agriculture Construction of off-site power supply installations of Iki-Burulsky group water supply system that delivers to Republic of Kalmykia ground waters of S... More 110/6kW construction 2008-2009
Eletskaya TPP TGK-4 Construction of the combined-cycle plant on the base of the existing CHP. Main Builfing Equipment Configuration 3-D View   January 2007.... More 52 MW Construction 2006-2008
Kuibishevsky NPZ ZAO Jukos-RM Reconstruction of the existing Thermal power plants with replacement of the out-dated equipment and installation of two steam turbines.   12 MW reconstruction 2004-2006
Ulan-Udenskaya Thermal Power Plant-1, OAO Buryatenergo, OAO TGK-14 RAO EES Replacement of a pressure-reducing desuperheating station of turbine department, reconstruction of an automatic fire-extinguishing systems for fuel fe... More 12 MW reconstruction 2002-2004
ZAO Ostashkovsky tannery Reconstruction of Thermal Power Plant with installation of a turbine generator.   1,5 MW reconstruction 2002-2004
Vyatsko-Polyanskogo Engineering Plat Molot, Boiler-house at mini Thermal Power Plant   1,5 MW reconstruction 2002-2004
Electric equipment factory ZAO ZETO Reconstruction of an existing mini Thermal Power Plant with installation of turbine TG-3,5/6,3 R12/1,2.   0,6 MW reconstruction 2002-2003
Electric power substation Eliseevskaya Electric power substation in a part of the electricity supply project of the steel making industry.     June 2007. Installation of bus ... More 110/10KW Construction 2006-2007


Water treatment installations in progress

  Customer Object Capacity works Period  
Kstovsky NPZ Lukoil - Nizhegorodorgsintez Construction of a water demineralization unit with a condensate purification plant: complex of water treatment installations for salt-free water and p... More 400 m3/hr construction 2007-2009


Finished water treatment installations

  Customer Object Capacity works Period  
Yoshkarolinskaya Thermal Power Plant-1, boiler-house 37 Reconstruction of a demineralization unit with a replacement of sulfonated coal by carboxylic cationates 1200 m3/hr reconstruction 2005-2006
Nizhnetagilsky Metallurgical Complex O EvrazHolding Scope of construction works of new water demineralization units (WTP), including desalting plants and soft water plants   Types of equipment ... More 950 m3/hr construction 2005-2007
Salavatnefteorgsintez, Fertilizer Plant Reconstruction of the existing water demineralization unit that treats water for feeding to BGM-35 boilers and for process needs.   Desalting... More 850 m3/hr reconstruction 2005-2007
Novolipetsky Metallurgical Complex WTS CHP, water demineralization plant – the 1 waiting list. Reconstruction of WTS installation in a number of 4 existing parallel bare sodium-c... More 560 m3/h + 500 m3/h reconstruction 2003-2006
FGUP Rosatomstroy Sibirsky Chemical Complex Water demineralization unit for Thermal Power Plant         500 m3/hr design 2005-2006
Ryazanskaya Refiner TNK-BP Construction of water demineralization units for power supply units of vacuum gas oil hydrofining complex   January 2005. Equipment install... More 450 m3/hr construction 2002-2005
Mosenergo Thermal Power Plant-12 RAO EES Installation of I and II double - stages desalinization according to UPCORE of the common productivity 400 t/h.   December 2003. Desalting un... More 450 m3/h reconstruction 2002-2003
Nizhovenergo, Dzerzhinskaya Thermal Power Plant Reconstruction of a demineralization unit according to UpCoRe technology. Primary stage 200 m3/hr. Secondary stage 400 m3/hr 200/400 m3/hr reconstruction 2004-2005
Sibur-Khimprom Design project for reconstruction of a demineralization unit in a water treatment workshop with application of ionizing technology.   300 m3/hr reconstruction 2001-2002
Kalininskaya Nuclear Power Plant FGUP Rosenergoatom Reconstruction of dematerializing charging cycle and blow-of water refining of the steam generator. (V-5) with installation of technology of the ret... More 280 m3/h reconstruction 2002-2004
Beloyarskaya Nuclear Power Station FGUP Rosenergoatom WTS, water demineralization plant - the construction of two objects, of the 4-th power generation plant, which is under the construction.   J... More 150 m3/h reconstruction 2002-2004


 